Brand Logos_EcoSift

AERAS Windsifter

Plug-and-Play Windsifter Attachment.

Have contaminated overs piling up? Too much plastic in your compost? Too much rock in your mulch?

The EcoSift AERAS is a low-cost and plug-and-play windsifter ideal for removing light fraction contaminants. It attaches to any machine’s overs belt and effectively decontaminates your overs and recovers valuable organics.

Compatible with any screener’s 32″ – 48″ wide belt, the AERAS Windsifter is easy to install and removes plastic, foils, and other light contaminants from your process.

Less contaminants, more profits with the AERAS Windsifter.

Request Spec Sheet

Product Features

Product-Features_Maximum-Compatibility

MAXIMUM COMPATIBILITY

Plug the Aeras into any unit with a 40-liter per minute hydraulic connection and start windsifting.

The EcoSift AERAS is portable and can be easily moved from location to location.

FOUR DIFFERENT POWER OPTIONS

The Aeras is available in hydraulic, electric-hydraulic, diesel, and fully electric configurations.

Product-Features_Simple-Installation

SIMPLE INSTALLATION

Connect to a power source, fit over the conveyor of your discharge stream, and you’re ready to go.

Product-Features_Portability

PORTABILITY

The small size and easy set-up make the AERAS easy to transport from one site to another.

Aeras Windsifter Demonstration

Interested in the EcoSift AERAS Windsifter? Contact us to arrange an on-site demonstration at your facility, running your material, to see just how good it is!

Schedule Live Demo

Case Studies

Kurtz Bros. Bring Consistency, Increase Volume With Backers Star Screen.

July 18, 2022

Kurtz Bros., Inc. has been a stalwart in Ohio for decades. Founded in 1948, they are best known for their mulch, topsoil and compost production, although they also offer various…

Read More

Production Up, Costs Down in Richland, Washington

June 27, 2022

The waste never stops at the Horn Rapids Landfill in Richland, Washington. Tracy Reed, the lead operator for the City of Richland, found that his processing equipment was stopping, however.…

Read More

380 McKinney Landfill Boosts Their Volume With the INVENTHOR 9

March 9, 2022

David Dugger had a problem. As the General Manager of the new 380 McKinney Landfill in McKinney, Texas, he was receiving anywhere from 700 – 1,000 tons of bulky construction…

Read More